![]() | Solar Potential Analysis - Co-operation between SUN-AREA Osnabrück and BSF Swissphoto AG (23.08.2010)For solar potential analysis encountering large areas the SUN-AREA Osnabrück and BSF Swissphoto are co-operating. From now on, BSF Swissphoto is able to serve Swiss clients with solar potential analysis. | |
![]() | Contract between EMI, Istanbul and BSF Swissphoto (26.07.2010)On July 26, 2010, an agreement has been signed between EMI, Istanbul, and BSF Swissphoto AG, Zürich. | |
![]() | BSF Swissphoto at Intergeo in Cologne, Germany (5.-7.10.2010)We will present a wide range of technologies and applications, which base on the deployment of highly-modern laser and image sensors for airborne and terrestrial data acquisition. | |
![]() | Mit Millimetergenauigkeit durch den Gotthard (05.07.2010)Am 15. Oktober 2010 wird die Tunnelbohrmaschine voraussichtlich in der Oströhre von Faido das letzte Stück Fels Richtung Sedrun durchbrechen. Damit wird der mit 57 km längste Eisenbahntunnel der Welt Realität. Die Vermessung leistet beim Jahrhundertprojekt Gotthard-Basistunnel einen zentralen Beitrag. Feiern Sie mit uns! | |
![]() | Cambio della direzione dello Studio Meier SA di Minusio (01.07.2010)A partire dal 1 luglio 2010 la direzione dello Studio Meier SA sarà assunta dal signor Ivo Schätti, ing. dipl. ETHZ. Vi preghiamo quindi di rivolgervi per questioni amministrative o commerciali direttamente al signor Schätti. | |




